title: "PV Plant Petershagen"
|
|
client: "NaturStromAnlagen GmbH"
|
|
date: "2025-02-01"
|
|
dateString: "04/2024 to 02/2025"
|
|
location: "15326 Petershagen"
|
|
featuredImage: "/assets/photos/DSC01123.JPG"
|
|
---
|
|
|
|
- Excavation and backfilling of 12,000 m cable trench
|
|
- 3,000 m HDD directional drilling d 225 / d 200 / d 160
|
|
- 10,000 m laying of MV cable 630 mm², 18/30 kV
|
|
- 17,000 m laying of MV cable 800 mm², 18/30 kV
|
|
- 10,000 m laying of PE protective pipe 50 x 4.6 mm
|
|
- 10,000 m fiber optic cable blowing, 12 fibers
|
|
- All medium voltage assembly works
|
|
- VLF / Sheath testing / OTDR
|