title: "Grid Expansion Commercial Area Ketzin"
|
|
client: "E.DIS Netz GmbH"
|
|
date: "2025-06-01"
|
|
dateString: "01/2025 to 06/2025"
|
|
location: "14669 Ketzin"
|
|
featuredImage: "/assets/photos/DJI_0048.JPG"
|
|
---
|
|
|
|
- Excavation and backfilling of 1,600 m cable trench
|
|
- 7,500 m HDD directional drilling d 180
|
|
- 11,200 m laying of MV cable 240 mm², 12/20 kV
|
|
- 11,200 m laying of PE protective pipe 50 x 4.6 mm
|
|
- All medium voltage assembly works
|
|
- VLF testing
|