Files
e-tib.com/content/en/referenzen/dettmannsdorf.mdx
Marc Mintel f0ba5321bb
All checks were successful
Build & Deploy / 🔍 Prepare (push) Successful in 44s
Build & Deploy / 🧪 QA (push) Successful in 1m4s
Build & Deploy / 🏗️ Build (push) Successful in 1m54s
Build & Deploy / 🚀 Deploy (push) Successful in 28s
Build & Deploy / 🧪 Post-Deploy Verification (push) Successful in 43s
Build & Deploy / 🔔 Notify (push) Successful in 2s
feat: AI image classification and dynamic fallback assignment
2026-06-16 14:16:39 +02:00

17 lines
528 B
Plaintext

---
title: "PV Plant Dettmannsdorf"
client: "Energiekontor AG"
date: "2026-06-01"
dateString: "01/2025 to 06/2026"
location: "18334 Dettmannsdorf"
---
- Excavation and backfilling of 12,300 m cable trench
- 14,200 m HDD directional drilling d 225 / d 200 / d 180
- 26,500 m laying of MV cable 630 mm², 18/30 kV
- 7,100 m laying of MV cable 1000 mm², 18/30 kV
- 26,500 m laying of PE protective pipe 50 x 4.6 mm
- 26,500 m fiber optic cable blowing, 12 fibers
- All medium voltage assembly works
- VLF / Sheath testing / OTDR