All checks were successful
Build & Deploy / 🔍 Prepare (push) Successful in 54s
Build & Deploy / 🧪 QA (push) Successful in 2m7s
CI - Lint, Typecheck & Test / quality-assurance (pull_request) Successful in 3m31s
Build & Deploy / 🏗️ Build (push) Successful in 3m47s
Build & Deploy / 🚀 Deploy (push) Successful in 34s
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 4s
18 lines
597 B
Plaintext
18 lines
597 B
Plaintext
---
|
|
title: "110 kV Cable Route Jevenstedt OT Altenkattbek"
|
|
client: "wpd GmbH"
|
|
date: "2026-03-01"
|
|
dateString: "since 03/2026"
|
|
location: "24808 Jevenstedt"
|
|
featuredImage: "/assets/photos/DSC01137.JPG"
|
|
---
|
|
|
|
- Excavation and backfilling of 500 m cable trench
|
|
- 4,500 m plowing of 3 x PE protective pipe d 160
|
|
- 3,200 m HDD directional drilling d 160
|
|
- 8,500 m laying of HV cable 1,000 mm² 64/110 kV
|
|
- 11 sets of connection joints 1,000 mm² 64/110 kV
|
|
- 2 sets of outdoor terminations 1,000 mm² 64/110 kV
|
|
- 8,500 m fiber optic cable blowing, 12 fibers
|
|
- High-voltage testing with PD measurement/OTDR
|