All checks were successful
Build & Deploy / 🔍 Prepare (push) Successful in 54s
Build & Deploy / 🧪 QA (push) Successful in 2m7s
CI - Lint, Typecheck & Test / quality-assurance (pull_request) Successful in 3m31s
Build & Deploy / 🏗️ Build (push) Successful in 3m47s
Build & Deploy / 🚀 Deploy (push) Successful in 34s
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 4s
18 lines
569 B
Plaintext
18 lines
569 B
Plaintext
---
|
|
title: "PV Plant Prötzel OT Sternebeck"
|
|
client: "Trianel GmbH"
|
|
date: "2025-08-01"
|
|
dateString: "02/2025 to 08/2025"
|
|
location: "15345 Prötzel"
|
|
featuredImage: "/assets/photos/DJI_0243.JPG"
|
|
---
|
|
|
|
- Excavation and backfilling of 2,600 m cable trench
|
|
- 3,800 m HDD directional drilling d 225 / d 200 / d 160
|
|
- 7,500 m laying of MV cable 240 mm², 18/30 kV
|
|
- 8,800 m laying of MV cable 800 mm², 18/30 kV
|
|
- 15,800 m laying of PE protective pipe 50 x 4.6 mm
|
|
- 15,800 m fiber optic cable blowing, 12 fibers
|
|
- All medium voltage assembly works
|
|
- VLF / Sheath testing / OTDR
|