Files
e-tib.com/content/en/referenzen/goerne.mdx
Marc Mintel 843d61cd5d
Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 23s
Build & Deploy / 🧪 QA (push) Failing after 1m8s
Build & Deploy / 🏗️ Build (push) Has been skipped
Build & Deploy / 🚀 Deploy (push) Has been skipped
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 1s
feat: overhaul competence pages, unify brand colors, and polish site integrity
- Rewrote all 5 competence pages (Kabeltiefbau, Bohrtechnik, Glasfaser, Planung, Vermessung) with factual data from references
- Unified brand colors: replaced toxic neon green with brand-aligned teal (#10a379)
- Fixed ReferencesSlider injection in dynamic MDX pages
- Enhanced Footer with icon parity, improved branding placement, and unified hover effects
- Refined Header with 3D micro-animations and improved dropdown visibility
- Fixed localized tracking API (rewrites for /stats/api/send)
- Resolved ReferenceErrors in InteractiveGermanyMap and Header state management
- Cleaned reference titles and truncated metadata in lists
2026-05-15 21:07:25 +02:00

20 lines
746 B
Plaintext

---
title: "PV System Feed-in, Görne"
client: "EVH GmbH"
date: "2020-05-01"
dateString: "05/2020 to 07/2020"
location: "14728 Görne"
featuredImage: "/assets/photos/DSC08744.JPG"
---
- 4,215 m cable trench excavation and backfilling
- 1,285 m horizontal directional drilling d 140 + d 50
- 5,500 m installation of MV cable 300 mm², 12/20 kV
- 4,500 m installation of MV cable 300 mm², 12/20 kV by cable plow
- 10,000 m installation of PE protection pipe 50 x 4.6 mm
- 10,000 m blowing in of FO cable, 12 fibers
- 3 units delivery and assembly of FO connection joint, 12 fibers
- 16 sets assembly of MV connection joint 300 mm², 12/20 kV
- 4 sets assembly of MV T-connectors 300 mm², 12/20 kV
- Sheath testing, VLF testing, OTDR measurement