title: "Wind Farm Ostbevern"
client: "GP Joule Anlagenbau GmbH & Co. KG"
date: "2026-03-01"
dateString: "02/2025 to 03/2026"
location: "48346 Ostbevern"
featuredImage: "/assets/photos/DJI_0048.JPG"
---
- Excavation and backfilling of 4,100 m cable trench
- 3,200 m HDD directional drilling d 180 + d 50
- 3,200 m laying of MV cable 150 mm², 18/30 kV
- 4,000 m laying of MV cable 300 mm², 18/30 kV
- 7,500 m laying of PE protective pipe 50 x 4.6 mm
- 7,500 m fiber optic cable blowing, 12 fibers
- All medium voltage assembly works
- VLF / Sheath testing / OTDR