--- title: "Wind Farm Ostbevern" client: "GP Joule Anlagenbau GmbH & Co. KG" date: "2026-03-01" dateString: "02/2025 to 03/2026" location: "48346 Ostbevern" featuredImage: "/assets/photos/DJI_0048.JPG" --- - Excavation and backfilling of 4,100 m cable trench - 3,200 m HDD directional drilling d 180 + d 50 - 3,200 m laying of MV cable 150 mm², 18/30 kV - 4,000 m laying of MV cable 300 mm², 18/30 kV - 7,500 m laying of PE protective pipe 50 x 4.6 mm - 7,500 m fiber optic cable blowing, 12 fibers - All medium voltage assembly works - VLF / Sheath testing / OTDR