6de8ad8516 fix(content): correct drilling distance for Jevenstedt reference
All checks were successful
Build & Deploy / 🔍 Prepare (push) Successful in 53s
Build & Deploy / 🧪 QA (push) Successful in 1m25s
Build & Deploy / 🏗️ Build (push) Successful in 2m41s
Build & Deploy / 🚀 Deploy (push) Successful in 32s
Build & Deploy / 🧪 Post-Deploy Verification (push) Successful in 56s
Build & Deploy / 🔔 Notify (push) Successful in 2s
2026-06-20 17:06:20 +02:00
023fef5343 chore: trigger pipeline
All checks were successful
Build & Deploy / 🔍 Prepare (push) Successful in 30s
Build & Deploy / 🧪 QA (push) Successful in 1m21s
Build & Deploy / 🏗️ Build (push) Successful in 2m19s
Build & Deploy / 🚀 Deploy (push) Successful in 29s
Build & Deploy / 🧪 Post-Deploy Verification (push) Successful in 55s
Build & Deploy / 🔔 Notify (push) Successful in 2s
2026-06-20 10:24:35 +02:00
3 changed files with 3 additions and 3 deletions

View File

@@ -9,7 +9,7 @@ featuredImage: "/assets/photos/DJI_0037.JPG"
- 500 m Kabelgraben ausheben und verfüllen
- 4.500 m Einpflügen von 3 x PE-Schutzrohr d 160
- 3.200 m Horizontalspülbohrung d 160
- 12.000 m Horizontalspülbohrung d 160
- 8.500 m Verlegung HS-Kabel 1.000 mm² 64/110 kV
- 11 Satz Verbindungsmuffen 1.000 mm² 64/110 kV
- 2 Satz Freiluftendverschlüsse 1.000 mm² 64/110 kV

View File

@@ -9,7 +9,7 @@ featuredImage: "/assets/photos/DJI_0037.JPG"
- Excavation and backfilling of 500 m cable trench
- 4,500 m plowing of 3 x PE protective pipe d 160
- 3,200 m HDD directional drilling d 160
- 12,000 m HDD directional drilling d 160
- 8,500 m laying of HV cable 1,000 mm² 64/110 kV
- 11 sets of connection joints 1,000 mm² 64/110 kV
- 2 sets of outdoor terminations 1,000 mm² 64/110 kV

View File

@@ -138,7 +138,7 @@
"prepare": "husky",
"preinstall": "npx only-allow pnpm"
},
"version": "2.2.13-rc.63",
"version": "2.2.13-rc.64",
"pnpm": {
"onlyBuiltDependencies": [
"@parcel/watcher",