fix: address remaining UI and content feedback from Marisa
Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 37s
Build & Deploy / 🧪 QA (push) Failing after 56s
Build & Deploy / 🏗️ Build (push) Has been skipped
Build & Deploy / 🚀 Deploy (push) Has been skipped
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 2s
Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 37s
Build & Deploy / 🧪 QA (push) Failing after 56s
Build & Deploy / 🏗️ Build (push) Has been skipped
Build & Deploy / 🚀 Deploy (push) Has been skipped
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 2s
This commit is contained in:
@@ -27,7 +27,7 @@ layout: "fullBleed"
|
||||
Since our foundation in 2015 in Guben, we have made it our mission to actively shape the expansion of critical infrastructure.
|
||||
</div>
|
||||
<div>
|
||||
With 100+ dedicated employees and a state-of-the-art machinery park, we master even the most demanding projects in cable network construction, directional drilling, and grid assembly. Reliability, adherence to schedules, and the highest quality standards are our foundation.
|
||||
With over 100 experts for your project (including specialists from E-TIB GmbH, E-TIB Bohrtechnik and E-TIB Ingenieurgesellschaft) and a state-of-the-art machinery park, we master even the most demanding projects in cable network construction, directional drilling, and grid assembly. Reliability, adherence to schedules, and the highest quality standards are our foundation.
|
||||
</div>
|
||||
</div>
|
||||
<div className="grid grid-cols-2 gap-6">
|
||||
@@ -52,7 +52,20 @@ layout: "fullBleed"
|
||||
</div>
|
||||
</div>
|
||||
|
||||
<InteractiveGermanyMap isHero={true} badge="Nationwide Presence" title="Infrastructure for an entire country" description="Since 2016, we have proven in over 200 projects across Germany that we reliably implement infrastructure projects of any scale." />
|
||||
<div className="bg-[#050B14] py-24 md:py-32 text-white relative overflow-hidden group my-16 md:my-24 rounded-[2.5rem] md:rounded-[3.5rem] mx-4 md:mx-auto max-w-7xl">
|
||||
<div className="absolute inset-0 bg-[url('/assets/photos/Etib_E-tib_Tiefbau_Guben_Netzanbindung_Energie-54.jpg')] opacity-20 bg-cover bg-center mix-blend-overlay group-hover:scale-105 transition-transform duration-1000"></div>
|
||||
<div className="absolute inset-0 bg-gradient-to-br from-[#050B14] via-[#0A1322]/90 to-[#050B14]"></div>
|
||||
<div className="container max-w-4xl mx-auto px-4 relative z-10 text-center">
|
||||
<div className="inline-block px-4 py-1.5 rounded-full bg-primary/10 text-primary border border-primary/20 text-xs font-bold uppercase tracking-wider mb-8">
|
||||
Nationwide Presence
|
||||
</div>
|
||||
<h2 className="font-heading text-4xl md:text-5xl lg:text-6xl font-extrabold mb-6 leading-tight text-transparent bg-clip-text bg-gradient-to-r from-white to-white/70">Infrastructure for<br />an entire country</h2>
|
||||
<p className="text-lg md:text-xl text-white/60 mb-12 max-w-2xl mx-auto leading-relaxed">Since 2016, we have proven in over 200 projects across Germany that we reliably implement infrastructure projects of any scale.</p>
|
||||
<a href="/en/referenzen" className="inline-flex items-center gap-3 bg-primary text-[#050B14] px-8 py-4 rounded-xl font-bold uppercase tracking-wider hover:bg-white hover:-translate-y-1 transition-all duration-300 shadow-[0_0_20px_rgba(130,237,32,0.3)]">
|
||||
View our references <span className="text-xl leading-none">→</span>
|
||||
</a>
|
||||
</div>
|
||||
</div>
|
||||
|
||||
<CompanyTimeline />
|
||||
|
||||
@@ -86,7 +99,7 @@ layout: "fullBleed"
|
||||
title: "E-TIB Bohrtechnik GmbH",
|
||||
description: "Precise horizontal directional drilling in all soil classes for surface-friendly and trenchless pipe laying.",
|
||||
icon: "M12 3v1m0 16v1m9-9h-1M4 12H3m15.364 6.364l-.707-.707M6.343 6.343l-.707-.707m12.728 0l-.707.707M6.343 17.657l-.707.707M16 12a4 4 0 11-8 0 4 4 0 018 0z",
|
||||
url: "/en/standorte/kirchheilingen",
|
||||
url: "/en/bohrtechnik",
|
||||
backgroundImage: "/assets/photos/Etib_E-tib_Tiefbau_Guben_Netzanbindung_Energie-47.jpg"
|
||||
}
|
||||
]}
|
||||
|
||||
Reference in New Issue
Block a user