feat: Implement client feedback & visual verifications
Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 30s
CI - Lint, Typecheck & Test / quality-assurance (pull_request) Successful in 1m41s
Build & Deploy / 🧪 QA (push) Successful in 57s
Build & Deploy / 🏗️ Build (push) Successful in 2m11s
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been cancelled
Build & Deploy / 🔔 Notify (push) Has been cancelled
Build & Deploy / 🚀 Deploy (push) Has been cancelled
Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 30s
CI - Lint, Typecheck & Test / quality-assurance (pull_request) Successful in 1m41s
Build & Deploy / 🧪 QA (push) Successful in 57s
Build & Deploy / 🏗️ Build (push) Successful in 2m11s
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been cancelled
Build & Deploy / 🔔 Notify (push) Has been cancelled
Build & Deploy / 🚀 Deploy (push) Has been cancelled
- Update contact map container alignment - Remove outdated marketing copy on service pages - Update HDD specs to 400m / 600mm - Unify reference slider titles globally - Add employee breakdown stats to Über Uns page
This commit is contained in:
@@ -26,7 +26,7 @@ layout: "fullBleed"
|
||||
|
||||
## HDD Directional Drilling & Pneumatic Earth Rockets
|
||||
|
||||
Armed with a state-of-the-art, specialized fleet of drilling rigs, we master complex subterranean conditions. Utilizing the **Horizontal Directional Drilling (HDD)** method, we guide the drill head with centimeter-level accuracy beneath obstacles. This enables us to achieve continuous drilling lengths of up to 250 meters in a single run, pulling in high-durability protective conduits with diameters up to 400 mm.
|
||||
Armed with a state-of-the-art, specialized fleet of drilling rigs, we master complex subterranean conditions. Utilizing the **Horizontal Directional Drilling (HDD)** method, we guide the drill head with centimeter-level accuracy beneath obstacles. This enables us to achieve continuous drilling lengths of up to 400 meters in a single run and, depending on the drilling length, pull in high-durability protective conduits with diameters up to 600 mm.
|
||||
|
||||
For localized, rapid deployments—such as residential service connections—we deploy high-speed **pneumatic earth rockets** (soil displacement). This method allows us to complete under-crossings of up to 15 meters for conduits up to 160 mm in diameter, ensuring pristine driveways, manicured gardens, and pedestrian walks remain completely undisturbed.
|
||||
|
||||
@@ -47,8 +47,8 @@ layout: "fullBleed"
|
||||
fullWidth: false,
|
||||
lists: [
|
||||
[
|
||||
"Max. drilling length: 250 m",
|
||||
"Max. diameter: 400mm pipe",
|
||||
"Max. drilling length: 400 m",
|
||||
"Max. diameter: 600mm pipe",
|
||||
"Precision control and steerability",
|
||||
"Crossing of railways, highways & water bodies"
|
||||
]
|
||||
@@ -71,7 +71,7 @@ layout: "fullBleed"
|
||||
]}
|
||||
/>
|
||||
|
||||
<HomeReferencesSlider badge="Case Studies" title="Completed Drilling Projects" description="Successful HDD drilling and trenchless cable laying under the most complex conditions." />
|
||||
<HomeReferencesSlider badge="Case Studies" title="References" description="Successful HDD drilling and trenchless cable laying under the most complex conditions." />
|
||||
|
||||
<CallToAction
|
||||
title="Looking for a trenchless solution?"
|
||||
|
||||
Reference in New Issue
Block a user