feat: Implement client feedback & visual verifications
Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 30s
CI - Lint, Typecheck & Test / quality-assurance (pull_request) Successful in 1m41s
Build & Deploy / 🧪 QA (push) Successful in 57s
Build & Deploy / 🏗️ Build (push) Successful in 2m11s
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been cancelled
Build & Deploy / 🔔 Notify (push) Has been cancelled
Build & Deploy / 🚀 Deploy (push) Has been cancelled
Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 30s
CI - Lint, Typecheck & Test / quality-assurance (pull_request) Successful in 1m41s
Build & Deploy / 🧪 QA (push) Successful in 57s
Build & Deploy / 🏗️ Build (push) Successful in 2m11s
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been cancelled
Build & Deploy / 🔔 Notify (push) Has been cancelled
Build & Deploy / 🚀 Deploy (push) Has been cancelled
- Update contact map container alignment - Remove outdated marketing copy on service pages - Update HDD specs to 400m / 600mm - Unify reference slider titles globally - Add employee breakdown stats to Über Uns page
This commit is contained in:
@@ -26,7 +26,7 @@ layout: "fullBleed"
|
||||
|
||||
## HDD Directional Drilling & Pneumatic Earth Rockets
|
||||
|
||||
Armed with a state-of-the-art, specialized fleet of drilling rigs, we master complex subterranean conditions. Utilizing the **Horizontal Directional Drilling (HDD)** method, we guide the drill head with centimeter-level accuracy beneath obstacles. This enables us to achieve continuous drilling lengths of up to 250 meters in a single run, pulling in high-durability protective conduits with diameters up to 400 mm.
|
||||
Armed with a state-of-the-art, specialized fleet of drilling rigs, we master complex subterranean conditions. Utilizing the **Horizontal Directional Drilling (HDD)** method, we guide the drill head with centimeter-level accuracy beneath obstacles. This enables us to achieve continuous drilling lengths of up to 400 meters in a single run and, depending on the drilling length, pull in high-durability protective conduits with diameters up to 600 mm.
|
||||
|
||||
For localized, rapid deployments—such as residential service connections—we deploy high-speed **pneumatic earth rockets** (soil displacement). This method allows us to complete under-crossings of up to 15 meters for conduits up to 160 mm in diameter, ensuring pristine driveways, manicured gardens, and pedestrian walks remain completely undisturbed.
|
||||
|
||||
@@ -47,8 +47,8 @@ layout: "fullBleed"
|
||||
fullWidth: false,
|
||||
lists: [
|
||||
[
|
||||
"Max. drilling length: 250 m",
|
||||
"Max. diameter: 400mm pipe",
|
||||
"Max. drilling length: 400 m",
|
||||
"Max. diameter: 600mm pipe",
|
||||
"Precision control and steerability",
|
||||
"Crossing of railways, highways & water bodies"
|
||||
]
|
||||
@@ -71,7 +71,7 @@ layout: "fullBleed"
|
||||
]}
|
||||
/>
|
||||
|
||||
<HomeReferencesSlider badge="Case Studies" title="Completed Drilling Projects" description="Successful HDD drilling and trenchless cable laying under the most complex conditions." />
|
||||
<HomeReferencesSlider badge="Case Studies" title="References" description="Successful HDD drilling and trenchless cable laying under the most complex conditions." />
|
||||
|
||||
<CallToAction
|
||||
title="Looking for a trenchless solution?"
|
||||
|
||||
@@ -69,7 +69,7 @@ layout: "fullBleed"
|
||||
]}
|
||||
/>
|
||||
|
||||
<HomeReferencesSlider badge="Case Studies" title="Completed Broadband Projects" description="We have already successfully realized hundreds of kilometers of FTTX networks. Discover our references." />
|
||||
<HomeReferencesSlider badge="Case Studies" title="References" description="We have already successfully realized hundreds of kilometers of FTTX networks. Discover our references." />
|
||||
|
||||
<CallToAction
|
||||
title="Are you planning an FTTX expansion?"
|
||||
|
||||
@@ -18,7 +18,7 @@ description: "E-TIB GmbH is your reliable partner for complex cable routes, hori
|
||||
companies={[
|
||||
{
|
||||
title: "E-TIB GMBH",
|
||||
description: "The company has fully specialized in cable civil engineering. The complete range of services for the construction of cable routes from a single source.",
|
||||
description: "The complete range of services for the construction of cable routes from a single source.",
|
||||
icon: "M3 9l9-7 9 7v11a2 2 0 0 1-2 2H5a2 2 0 0 1-2-2z",
|
||||
backgroundImage: "/assets/photos/DJI_0243.JPG"
|
||||
},
|
||||
|
||||
@@ -28,7 +28,7 @@ layout: "fullBleed"
|
||||
|
||||
## Integrated Excellence from a Single Source
|
||||
|
||||
At E-TIB, we leverage decades of collective expertise to anticipate structural and geological bottlenecks long before the first shovel hits the ground. Our specialization in cable civil engineering guarantees that every deployment runs with absolute precision.
|
||||
At E-TIB, we leverage decades of collective expertise to anticipate structural and geological bottlenecks long before the first shovel hits the ground.
|
||||
|
||||
We deliver turnkey cable routes entirely in-house. Our operations are powered by a cutting-edge fleet of heavy machinery and staffed exclusively by highly trained, permanent regional professionals. Working in close synergy with our sister firm, **E-TIB Ingenieurgesellschaft mbH**, we eliminate planning oversights at the inception phase and effortlessly handle the most complex GIS and administrative documentation requirements in the industry.
|
||||
|
||||
@@ -38,9 +38,7 @@ layout: "fullBleed"
|
||||
<ServiceDetailGrid
|
||||
badge="Service Portfolio"
|
||||
title="Everything for Your Network"
|
||||
descriptionParagraphs={[
|
||||
"We offer the highest precision, modern machines and certified experts for every civil engineering project - from cable laying to transformer stations."
|
||||
]}
|
||||
descriptionParagraphs={[]}
|
||||
panels={[
|
||||
{
|
||||
id: "grabenbau",
|
||||
@@ -73,7 +71,7 @@ layout: "fullBleed"
|
||||
]}
|
||||
/>
|
||||
|
||||
<HomeReferencesSlider badge="Case Studies" title="Completed Civil Engineering Projects" description="We have laid hundreds of kilometers of cables. Take a look at our reference projects." />
|
||||
<HomeReferencesSlider badge="Case Studies" title="References" description="We have laid hundreds of kilometers of cables. Take a look at our reference projects." />
|
||||
|
||||
<CallToAction
|
||||
title="Do you have a specific project?"
|
||||
|
||||
@@ -27,7 +27,7 @@ layout: "fullBleed"
|
||||
Since our foundation in 2015 in Guben, we have made it our mission to actively shape the expansion of critical infrastructure.
|
||||
</div>
|
||||
<div>
|
||||
With approx. 100 dedicated professionals and a state-of-the-art machinery park, we master even the most demanding projects in cable civil engineering, directional drilling, and grid assembly. Reliability, adherence to schedules, and the highest quality standards are our foundation.
|
||||
With 100+ dedicated employees and a state-of-the-art machinery park, we master even the most demanding projects in cable civil engineering, directional drilling, and grid assembly. Reliability, adherence to schedules, and the highest quality standards are our foundation.
|
||||
</div>
|
||||
</div>
|
||||
<div className="grid grid-cols-2 gap-6">
|
||||
@@ -63,7 +63,7 @@ layout: "fullBleed"
|
||||
companies={[
|
||||
{
|
||||
title: "E-TIB GMBH",
|
||||
description: "The company has fully specialized in cable civil engineering. The complete range of services for the construction of cable routes from a single source.",
|
||||
description: "The complete range of services for the construction of cable routes from a single source.",
|
||||
icon: "M3 9l9-7 9 7v11a2 2 0 0 1-2 2H5a2 2 0 0 1-2-2z",
|
||||
url: "/en/cable-civil-engineering",
|
||||
backgroundImage: "/assets/photos/DJI_0243.JPG"
|
||||
@@ -92,6 +92,34 @@ layout: "fullBleed"
|
||||
/>
|
||||
</div>
|
||||
|
||||
<div className="bg-white py-24 border-b border-neutral-100">
|
||||
<div className="container max-w-6xl mx-auto px-4">
|
||||
<div className="text-center mb-16">
|
||||
<div className="text-primary font-bold tracking-wider uppercase text-sm mb-4">Our Team</div>
|
||||
<h2 className="font-heading text-4xl md:text-5xl font-extrabold text-neutral-dark mb-6">Over 100 Experts for Your Project</h2>
|
||||
<div className="w-20 h-2 bg-primary mx-auto"></div>
|
||||
</div>
|
||||
<div className="grid grid-cols-2 md:grid-cols-4 gap-8">
|
||||
<div className="text-center">
|
||||
<div className="text-5xl font-extrabold text-primary mb-2">72</div>
|
||||
<div className="text-neutral-dark font-bold text-lg">E-TIB GmbH</div>
|
||||
</div>
|
||||
<div className="text-center">
|
||||
<div className="text-5xl font-extrabold text-primary mb-2">10</div>
|
||||
<div className="text-neutral-dark font-bold text-lg">E-TIB Bohrtechnik</div>
|
||||
</div>
|
||||
<div className="text-center">
|
||||
<div className="text-5xl font-extrabold text-primary mb-2">8</div>
|
||||
<div className="text-neutral-dark font-bold text-lg">E-TIB ING</div>
|
||||
</div>
|
||||
<div className="text-center">
|
||||
<div className="text-5xl font-extrabold text-primary mb-2">10</div>
|
||||
<div className="text-neutral-dark font-bold text-lg">Lower Saxony</div>
|
||||
</div>
|
||||
</div>
|
||||
</div>
|
||||
</div>
|
||||
|
||||
<CallToAction
|
||||
title="Ready for Your Project?"
|
||||
description="We are always looking for new challenges and strong partners. Contact us for a non-binding consultation on your project."
|
||||
|
||||
Reference in New Issue
Block a user