feat: overhaul competence pages, unify brand colors, and polish site integrity
Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 23s
Build & Deploy / 🧪 QA (push) Failing after 1m8s
Build & Deploy / 🏗️ Build (push) Has been skipped
Build & Deploy / 🚀 Deploy (push) Has been skipped
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 1s

- Rewrote all 5 competence pages (Kabeltiefbau, Bohrtechnik, Glasfaser, Planung, Vermessung) with factual data from references
- Unified brand colors: replaced toxic neon green with brand-aligned teal (#10a379)
- Fixed ReferencesSlider injection in dynamic MDX pages
- Enhanced Footer with icon parity, improved branding placement, and unified hover effects
- Refined Header with 3D micro-animations and improved dropdown visibility
- Fixed localized tracking API (rewrites for /stats/api/send)
- Resolved ReferenceErrors in InteractiveGermanyMap and Header state management
- Cleaned reference titles and truncated metadata in lists
This commit is contained in:
2026-05-15 21:07:25 +02:00
parent 4dcd5f511a
commit 843d61cd5d
47 changed files with 1125 additions and 690 deletions

View File

@@ -1,19 +1,17 @@
---
title: "Breitbandausbau FTTC, Planungsregion Spreewald"
title: "Broadband Expansion FTTC, Spreewald Planning Region"
client: "Telekom Deutschland GmbH"
date: "2018-01-31"
dateString: "09/2017 bis 01/2018"
location: "Spreewald"
date: "2017-09-01"
dateString: "09/2017 to 01/2018"
location: "Spreewald Planning Region"
featuredImage: "/assets/photos/DSC01129.JPG"
---
- 4.006 m Kabelgraben ausheben und verfüllen
- 4.006 m Verlegung PE-Schutzrohr 50 x 4,6 mm
- 13.008 m Horizontalspülbohrung D 50
- 94.951 m Einblasen von Kabel/Rohren unbelegt
- 42 Stück Stellen von Multifunktionsgehäusen
- Aufbau von Energieanschlusssäulen
- Aufbau elektrischer Anlagen 230V
- Koordination mit Energieversorgungsunternehmen
- Inbetriebnahme der elektrischen Anlagen
- Oberflächen- und Tiefbauarbeiten für Multifunktionsgehäuse
- 4,006 m cable trench excavation and backfilling
- 4,006 m installation of PE protection pipe 50 x 4.6 mm
- 13,008 m horizontal directional drilling D 50
- 94,951 m blowing in of cables/pipes (unoccupied)
- 42 units installation of multi-functional cabinets
- Setup of energy connection pillars and electrical systems 230V
- Coordination with utility companies and commissioning of the electrical systems
- Surface and civil engineering work for multi-function enclosures