feat: overhaul competence pages, unify brand colors, and polish site integrity
Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 23s
Build & Deploy / 🧪 QA (push) Failing after 1m8s
Build & Deploy / 🏗️ Build (push) Has been skipped
Build & Deploy / 🚀 Deploy (push) Has been skipped
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 1s
Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 23s
Build & Deploy / 🧪 QA (push) Failing after 1m8s
Build & Deploy / 🏗️ Build (push) Has been skipped
Build & Deploy / 🚀 Deploy (push) Has been skipped
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 1s
- Rewrote all 5 competence pages (Kabeltiefbau, Bohrtechnik, Glasfaser, Planung, Vermessung) with factual data from references - Unified brand colors: replaced toxic neon green with brand-aligned teal (#10a379) - Fixed ReferencesSlider injection in dynamic MDX pages - Enhanced Footer with icon parity, improved branding placement, and unified hover effects - Refined Header with 3D micro-animations and improved dropdown visibility - Fixed localized tracking API (rewrites for /stats/api/send) - Resolved ReferenceErrors in InteractiveGermanyMap and Header state management - Cleaned reference titles and truncated metadata in lists
This commit is contained in:
@@ -1,19 +1,19 @@
|
||||
---
|
||||
title: "Kabelverbindung U30 - T10, 15890 Eisenhüttenstadt"
|
||||
title: "Cable Connection U30 - T10, Eisenhüttenstadt"
|
||||
client: "ArcelorMittal Eisenhüttenstadt GmbH"
|
||||
date: "2019-12-31"
|
||||
dateString: "07/2019 bis 12/2019"
|
||||
location: "Eisenhüttenstadt"
|
||||
date: "2019-07-01"
|
||||
dateString: "07/2019 to 12/2019"
|
||||
location: "15890 Eisenhüttenstadt"
|
||||
featuredImage: "/assets/photos/Etib_E-tib_Tiefbau_Guben_Netzanbindung_Energie_Vermessung_(24_von_99)_groß2.jpg"
|
||||
---
|
||||
|
||||
- 2.095 m Kabelgraben ausheben und verfüllen
|
||||
- 180 m Horizontalspülbohrung d 160 + d 50
|
||||
- 5.700 m Lieferung und Verlegung MS-Kabel 240 mm², 18/30 kV
|
||||
- 3.000 m Lieferung und Verlegung PE-Schutzrohr 50 x 4,6 mm
|
||||
- 3.000 m Lieferung und Einblasen LWL-Kabel, 12 Fasern
|
||||
- 3.000 m Lieferung und Verlegung Steuerkabel, 0,6/1 kV
|
||||
- 16 Satz Lieferung und Montage MS-Verbindungsmuffe 240 mm², 18/30 kV
|
||||
- 1 Stück Lieferung und Montage LWL-Verbindungsmuffe, 12 Fasern
|
||||
- 4 Satz Lieferung und Montage MS-T-Stecker 240 mm², 18/30 kV
|
||||
- Hauptprüfung / Mantelprüfung / OTDR-Messung
|
||||
- 2,095 m cable trench excavation and backfilling
|
||||
- 180 m horizontal directional drilling d 160 + d 50
|
||||
- 5,700 m delivery and installation of MV cable 240 mm², 18/30 kV
|
||||
- 3,000 m delivery and installation of PE protection pipe 50 x 4.6 mm
|
||||
- 3,000 m delivery and blowing in of FO cable, 12 fibers
|
||||
- 3,000 m delivery and installation of control cable, 0.6/1 kV
|
||||
- 16 sets delivery and assembly of MV connection joint 240 mm², 18/30 kV
|
||||
- 1 unit delivery and assembly of FO connection joint, 12 fibers
|
||||
- 4 sets delivery and assembly of MV T-connectors 240 mm², 18/30 kV
|
||||
- Main testing / sheath testing / OTDR measurement
|
||||
|
||||