feat: overhaul competence pages, unify brand colors, and polish site integrity
Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 23s
Build & Deploy / 🧪 QA (push) Failing after 1m8s
Build & Deploy / 🏗️ Build (push) Has been skipped
Build & Deploy / 🚀 Deploy (push) Has been skipped
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 1s
Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 23s
Build & Deploy / 🧪 QA (push) Failing after 1m8s
Build & Deploy / 🏗️ Build (push) Has been skipped
Build & Deploy / 🚀 Deploy (push) Has been skipped
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 1s
- Rewrote all 5 competence pages (Kabeltiefbau, Bohrtechnik, Glasfaser, Planung, Vermessung) with factual data from references - Unified brand colors: replaced toxic neon green with brand-aligned teal (#10a379) - Fixed ReferencesSlider injection in dynamic MDX pages - Enhanced Footer with icon parity, improved branding placement, and unified hover effects - Refined Header with 3D micro-animations and improved dropdown visibility - Fixed localized tracking API (rewrites for /stats/api/send) - Resolved ReferenceErrors in InteractiveGermanyMap and Header state management - Cleaned reference titles and truncated metadata in lists
This commit is contained in:
@@ -1,12 +1,14 @@
|
||||
---
|
||||
title: "Breitbandausbau FTTH, Landkreis Börde"
|
||||
title: "Broadband Expansion FTTH, Börde District"
|
||||
client: "EKN Breitband GmbH & Co. KG"
|
||||
date: "2026-01-01"
|
||||
dateString: "seit 05/2019"
|
||||
location: "Landkreis Börde"
|
||||
date: "2019-05-01"
|
||||
dateString: "Since 05/2019"
|
||||
location: "Börde District"
|
||||
featuredImage: "/assets/photos/etib_ingenieure_tiefbau_solar_pv_planung_vermessung_gis-294.jpg"
|
||||
---
|
||||
|
||||
- 109.000 m Leitungstrasse herstellen (Tiefbau/HDD)
|
||||
- 63 Stück Aufstellung Netzverteiler
|
||||
- 747 Stück Herstellung Hausanschlüsse
|
||||
- 109,000 m production of cable route (civil engineering/HDD)
|
||||
- 63 units installation of network distributors
|
||||
- 747 units production of house connections
|
||||
- Coordination and realization of the entire route guidance
|
||||
- Documentation and acceptance of the house connections
|
||||
|
||||
Reference in New Issue
Block a user