- Rewrote all 5 competence pages (Kabeltiefbau, Bohrtechnik, Glasfaser, Planung, Vermessung) with factual data from references
- Unified brand colors: replaced toxic neon green with brand-aligned teal (#10a379)
- Fixed ReferencesSlider injection in dynamic MDX pages
- Enhanced Footer with icon parity, improved branding placement, and unified hover effects
- Refined Header with 3D micro-animations and improved dropdown visibility
- Fixed localized tracking API (rewrites for /stats/api/send)
- Resolved ReferenceErrors in InteractiveGermanyMap and Header state management
- Cleaned reference titles and truncated metadata in lists
This commit is contained in:
2026-05-15 21:07:25 +02:00
parent 4dcd5f511a
commit 843d61cd5d
47 changed files with 1125 additions and 690 deletions

View File

@@ -1,12 +1,14 @@
---
title: "Breitbandausbau FTTH, Landkreis Börde"
title: "Broadband Expansion FTTH, Börde District"
client: "EKN Breitband GmbH & Co. KG"
date: "2026-01-01"
dateString: "seit 05/2019"
location: "Landkreis Börde"
date: "2019-05-01"
dateString: "Since 05/2019"
location: "Börde District"
featuredImage: "/assets/photos/etib_ingenieure_tiefbau_solar_pv_planung_vermessung_gis-294.jpg"
---
- 109.000 m Leitungstrasse herstellen (Tiefbau/HDD)
- 63 Stück Aufstellung Netzverteiler
- 747 Stück Herstellung Hausanschlüsse
- 109,000 m production of cable route (civil engineering/HDD)
- 63 units installation of network distributors
- 747 units production of house connections
- Coordination and realization of the entire route guidance
- Documentation and acceptance of the house connections

View File

@@ -1,13 +1,13 @@
---
title: "Breitbandausbau FTTH, Planungsregion Bomlitz"
client: "Telekom Deutschland GmbH"
date: "2018-12-31"
dateString: "04/2018 bis 12/2018"
location: "Bomlitz"
featuredImage: "/assets/photos/Etib_E-tib_Tiefbau_Guben_Netzanbindung_Energie-100.jpg"
title: "Broadband Expansion FTTH, Bomlitz / Schwarmstedt"
client: "inexio Informationstechnologie und Telekommunikation GmbH"
date: "2018-08-01"
dateString: "08/2018 to 03/2021"
location: "29699 Bomlitz / 29690 Schwarmstedt"
featuredImage: "/assets/photos/Etib_E-tib_Tiefbau_Guben_Netzanbindung_Energie-60.jpg"
---
- 88.890 m Leitungstrasse herstellen (Tiefbau/HDD)
- 23 Stück Aufstellung Multifunktionsgehäuse
- 52 Stück Aufstellung Netzverteiler
- 571 Stück Herstellung Hausanschlüsse
- 88,890 m production of cable route (civil engineering/HDD)
- 23 units installation of multi-functional cabinets
- 52 units installation of network distributors
- 571 units production of house connections

View File

@@ -1,19 +1,19 @@
---
title: "Kabelverbindung U30 - T10, 15890 Eisenhüttenstadt"
title: "Cable Connection U30 - T10, Eisenhüttenstadt"
client: "ArcelorMittal Eisenhüttenstadt GmbH"
date: "2019-12-31"
dateString: "07/2019 bis 12/2019"
location: "Eisenhüttenstadt"
date: "2019-07-01"
dateString: "07/2019 to 12/2019"
location: "15890 Eisenhüttenstadt"
featuredImage: "/assets/photos/Etib_E-tib_Tiefbau_Guben_Netzanbindung_Energie_Vermessung_(24_von_99)_groß2.jpg"
---
- 2.095 m Kabelgraben ausheben und verfüllen
- 180 m Horizontalspülbohrung d 160 + d 50
- 5.700 m Lieferung und Verlegung MS-Kabel 240 mm², 18/30 kV
- 3.000 m Lieferung und Verlegung PE-Schutzrohr 50 x 4,6 mm
- 3.000 m Lieferung und Einblasen LWL-Kabel, 12 Fasern
- 3.000 m Lieferung und Verlegung Steuerkabel, 0,6/1 kV
- 16 Satz Lieferung und Montage MS-Verbindungsmuffe 240 mm², 18/30 kV
- 1 Stück Lieferung und Montage LWL-Verbindungsmuffe, 12 Fasern
- 4 Satz Lieferung und Montage MS-T-Stecker 240 mm², 18/30 kV
- Hauptprüfung / Mantelprüfung / OTDR-Messung
- 2,095 m cable trench excavation and backfilling
- 180 m horizontal directional drilling d 160 + d 50
- 5,700 m delivery and installation of MV cable 240 mm², 18/30 kV
- 3,000 m delivery and installation of PE protection pipe 50 x 4.6 mm
- 3,000 m delivery and blowing in of FO cable, 12 fibers
- 3,000 m delivery and installation of control cable, 0.6/1 kV
- 16 sets delivery and assembly of MV connection joint 240 mm², 18/30 kV
- 1 unit delivery and assembly of FO connection joint, 12 fibers
- 4 sets delivery and assembly of MV T-connectors 240 mm², 18/30 kV
- Main testing / sheath testing / OTDR measurement

View File

@@ -1,16 +1,16 @@
---
title: "Neubau Kabeltrasse, 03149 Forst"
title: "New Cable Route, Forst"
client: "Mitteldeutsche Netzgesellschaft Strom mbH"
date: "2020-09-30"
dateString: "03/2020 bis 09/2020"
location: "Forst"
date: "2020-03-01"
dateString: "03/2020 to 09/2020"
location: "03149 Forst"
featuredImage: "/assets/photos/DSC02156.jpg"
---
- 2984 m Kabelgraben ausheben und verfüllen
- 945 m Horizontalspülbohrung d 160 + d 50
- 3.929 m Verlegung MS-Kabel 240 mm², 12/20 kV
- 3.929 m Verlegung PE-Schutzrohr 50 x 4,6 mm
- 11 Satz Montage MS-Verbindungsmuffe 240 mm², 12/20 kV
- 1 Satz Montage MS-Endverschluss 240 mm², 12/20 kV
- 2.000 m Rückbau Freileitung (inkl. 16 Stück Maste)
- 2,984 m cable trench excavation and backfilling
- 945 m horizontal directional drilling d 160 + d 50
- 3,929 m installation of MV cable 240 mm², 12/20 kV
- 3,929 m installation of PE protection pipe 50 x 4.6 mm
- 11 sets assembly of MV connection joint 240 mm², 12/20 kV
- 1 set assembly of MV end termination 240 mm², 12/20 kV
- 2,000 m dismantling of overhead line (incl. 16 poles)

View File

@@ -1,19 +1,19 @@
---
title: "Einspeisung PV-Anlage 14728 Görne"
title: "PV System Feed-in, Görne"
client: "EVH GmbH"
date: "2020-07-31"
dateString: "05/2020 bis 07/2020"
location: "Görne"
date: "2020-05-01"
dateString: "05/2020 to 07/2020"
location: "14728 Görne"
featuredImage: "/assets/photos/DSC08744.JPG"
---
- 4.215 m Kabelgraben ausheben und verfüllen
- 1.285 m Horizontalspülbohrung d 140 + d 50
- 5.500 m Verlegung MS-Kabel 300 mm², 12/20 kV
- 4.500 m Verlegung MS-Kabel 300 mm², 12/20 kV mittels Kabelpflug
- 10.000 m Verlegung PE-Schutzrohr 50 x 4,6 mm
- 10.000 m Einblasen LWL-Kabel, 12 Fasern
- 3 Stück Lieferung und Montage LWL-Verbindungsmuffe, 12 Fasern
- 16 Satz Montage MS-Verbindungsmuffe 300 mm², 12/20 kV
- 4 Satz Montage MS-T-Stecker 300 mm², 12/20 kV
- Mantelprüfung, VLF-Prüfung, OTDR-Messung
- 4,215 m cable trench excavation and backfilling
- 1,285 m horizontal directional drilling d 140 + d 50
- 5,500 m installation of MV cable 300 mm², 12/20 kV
- 4,500 m installation of MV cable 300 mm², 12/20 kV by cable plow
- 10,000 m installation of PE protection pipe 50 x 4.6 mm
- 10,000 m blowing in of FO cable, 12 fibers
- 3 units delivery and assembly of FO connection joint, 12 fibers
- 16 sets assembly of MV connection joint 300 mm², 12/20 kV
- 4 sets assembly of MV T-connectors 300 mm², 12/20 kV
- Sheath testing, VLF testing, OTDR measurement

View File

@@ -1,19 +1,17 @@
---
title: "Breitbandausbau FTTC, Planungsregion Spreewald"
title: "Broadband Expansion FTTC, Spreewald Planning Region"
client: "Telekom Deutschland GmbH"
date: "2018-01-31"
dateString: "09/2017 bis 01/2018"
location: "Spreewald"
date: "2017-09-01"
dateString: "09/2017 to 01/2018"
location: "Spreewald Planning Region"
featuredImage: "/assets/photos/DSC01129.JPG"
---
- 4.006 m Kabelgraben ausheben und verfüllen
- 4.006 m Verlegung PE-Schutzrohr 50 x 4,6 mm
- 13.008 m Horizontalspülbohrung D 50
- 94.951 m Einblasen von Kabel/Rohren unbelegt
- 42 Stück Stellen von Multifunktionsgehäusen
- Aufbau von Energieanschlusssäulen
- Aufbau elektrischer Anlagen 230V
- Koordination mit Energieversorgungsunternehmen
- Inbetriebnahme der elektrischen Anlagen
- Oberflächen- und Tiefbauarbeiten für Multifunktionsgehäuse
- 4,006 m cable trench excavation and backfilling
- 4,006 m installation of PE protection pipe 50 x 4.6 mm
- 13,008 m horizontal directional drilling D 50
- 94,951 m blowing in of cables/pipes (unoccupied)
- 42 units installation of multi-functional cabinets
- Setup of energy connection pillars and electrical systems 230V
- Coordination with utility companies and commissioning of the electrical systems
- Surface and civil engineering work for multi-function enclosures