feat(content): update website content for tasks 6-10 including competencies, team, references, and statistics
All checks were successful
Build & Deploy / 🔍 Prepare (push) Successful in 54s
Build & Deploy / 🧪 QA (push) Successful in 2m7s
CI - Lint, Typecheck & Test / quality-assurance (pull_request) Successful in 3m31s
Build & Deploy / 🏗️ Build (push) Successful in 3m47s
Build & Deploy / 🚀 Deploy (push) Successful in 34s
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 4s
All checks were successful
Build & Deploy / 🔍 Prepare (push) Successful in 54s
Build & Deploy / 🧪 QA (push) Successful in 2m7s
CI - Lint, Typecheck & Test / quality-assurance (pull_request) Successful in 3m31s
Build & Deploy / 🏗️ Build (push) Successful in 3m47s
Build & Deploy / 🚀 Deploy (push) Successful in 34s
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 4s
This commit is contained in:
17
content/en/referenzen/jevenstedt.mdx
Normal file
17
content/en/referenzen/jevenstedt.mdx
Normal file
@@ -0,0 +1,17 @@
|
||||
---
|
||||
title: "110 kV Cable Route Jevenstedt OT Altenkattbek"
|
||||
client: "wpd GmbH"
|
||||
date: "2026-03-01"
|
||||
dateString: "since 03/2026"
|
||||
location: "24808 Jevenstedt"
|
||||
featuredImage: "/assets/photos/DSC01137.JPG"
|
||||
---
|
||||
|
||||
- Excavation and backfilling of 500 m cable trench
|
||||
- 4,500 m plowing of 3 x PE protective pipe d 160
|
||||
- 3,200 m HDD directional drilling d 160
|
||||
- 8,500 m laying of HV cable 1,000 mm² 64/110 kV
|
||||
- 11 sets of connection joints 1,000 mm² 64/110 kV
|
||||
- 2 sets of outdoor terminations 1,000 mm² 64/110 kV
|
||||
- 8,500 m fiber optic cable blowing, 12 fibers
|
||||
- High-voltage testing with PD measurement/OTDR
|
||||