feat(content): update website content for tasks 6-10 including competencies, team, references, and statistics
All checks were successful
Build & Deploy / 🔍 Prepare (push) Successful in 54s
Build & Deploy / 🧪 QA (push) Successful in 2m7s
CI - Lint, Typecheck & Test / quality-assurance (pull_request) Successful in 3m31s
Build & Deploy / 🏗️ Build (push) Successful in 3m47s
Build & Deploy / 🚀 Deploy (push) Successful in 34s
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 4s
All checks were successful
Build & Deploy / 🔍 Prepare (push) Successful in 54s
Build & Deploy / 🧪 QA (push) Successful in 2m7s
CI - Lint, Typecheck & Test / quality-assurance (pull_request) Successful in 3m31s
Build & Deploy / 🏗️ Build (push) Successful in 3m47s
Build & Deploy / 🚀 Deploy (push) Successful in 34s
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 4s
This commit is contained in:
@@ -72,7 +72,7 @@ description: "E-TIB GmbH is your reliable partner for complex cable routes, hori
|
||||
<div className="text-sm font-bold text-text-secondary uppercase tracking-wider">Founded</div>
|
||||
</div>
|
||||
<div>
|
||||
<div className="text-4xl font-black text-primary mb-1 tracking-tighter">50+</div>
|
||||
<div className="text-4xl font-black text-primary mb-1 tracking-tighter">100+</div>
|
||||
<div className="text-sm font-bold text-text-secondary uppercase tracking-wider">Employees</div>
|
||||
</div>
|
||||
</div>
|
||||
@@ -110,12 +110,12 @@ description: "E-TIB GmbH is your reliable partner for complex cable routes, hori
|
||||
ctaHref="/en/competencies"
|
||||
items={[
|
||||
{
|
||||
title: "Cable Construction",
|
||||
description: "Installation of medium and low voltage cables",
|
||||
title: "Cable Civil Engineering",
|
||||
description: "Cable civil engineering (high, medium, low voltage) and cable assembly up to 110 kV",
|
||||
tag: "Energy",
|
||||
size: "large",
|
||||
href: "/en/cable-civil-engineering",
|
||||
image: { url: "/assets/photos/DSC01123.JPG", alt: "Cable Construction" }
|
||||
image: { url: "/assets/photos/DSC01123.JPG", alt: "Cable Civil Engineering" }
|
||||
},
|
||||
{
|
||||
title: "Drilling Technology",
|
||||
|
||||
@@ -1,14 +1,14 @@
|
||||
---
|
||||
title: "Cable Civil Engineering"
|
||||
date: "2024-03-20"
|
||||
excerpt: "Professional cable civil engineering for medium and low voltage networks. We guarantee maximum safety standards and seamless documentation for your project."
|
||||
excerpt: "Professional cable civil engineering (high, medium, and low voltage) and cable assembly up to 110 kV. We guarantee maximum safety standards and seamless documentation for your project."
|
||||
layout: "fullBleed"
|
||||
---
|
||||
|
||||
<HeroSection
|
||||
badge="Core Competency"
|
||||
title="Cable Civil Engineering"
|
||||
subtitle="Complete infrastructure solutions for medium and low voltage networks"
|
||||
subtitle="Complete infrastructure solutions for high, medium, and low voltage networks and cable assembly up to 110 kV"
|
||||
backgroundImage={{ url: '/assets/photos/DSC01123.JPG' }}
|
||||
alignment="center"
|
||||
ctaLabel="Request a project"
|
||||
@@ -51,7 +51,7 @@ layout: "fullBleed"
|
||||
[
|
||||
"Production of cable and pipe trenches",
|
||||
"Cable laying from 0.4 kV to 110 kV",
|
||||
"Cable assembly from 0.4 kV to 30 kV",
|
||||
"Cable assembly up to 110 kV",
|
||||
"Cable plowing works for fast laying"
|
||||
]
|
||||
]
|
||||
|
||||
@@ -23,12 +23,12 @@ layout: "fullBleed"
|
||||
ctaHref="/en/contact"
|
||||
items={[
|
||||
{
|
||||
title: "Cable Construction",
|
||||
description: "Classic trench construction and professional laying of medium and low voltage cables.",
|
||||
title: "Cable Civil Engineering",
|
||||
description: "Classic trench construction, professional laying and cable assembly (high, medium, and low voltage) up to 110 kV.",
|
||||
tag: "Energy",
|
||||
size: "large",
|
||||
href: "/en/cable-civil-engineering",
|
||||
image: { url: "/assets/photos/DSC01123.JPG", alt: "Cable Construction" }
|
||||
image: { url: "/assets/photos/DSC01123.JPG", alt: "Cable Civil Engineering" }
|
||||
},
|
||||
{
|
||||
title: "Drilling Technology",
|
||||
@@ -70,13 +70,13 @@ layout: "fullBleed"
|
||||
panels={[
|
||||
{
|
||||
id: "energy",
|
||||
title: "Cable Civil Engineering (Medium/Low Voltage)",
|
||||
title: "Cable Civil Engineering (High/Medium/Low Voltage)",
|
||||
icon: "energy",
|
||||
lists: [
|
||||
[
|
||||
"Production of cable and pipe trenches",
|
||||
"Cable laying (0.4kV - 110kV)",
|
||||
"Cable assembly 0.4 kV - 30 kV",
|
||||
"Cable assembly up to 110 kV",
|
||||
"Construction of transformer stations",
|
||||
"Establishment of grounding systems",
|
||||
"Erection of street lighting",
|
||||
@@ -143,8 +143,8 @@ layout: "fullBleed"
|
||||
<JsonLd data={[
|
||||
{
|
||||
"@type": "Service",
|
||||
"name": "Cable Construction",
|
||||
"description": "Classic trench construction and professional laying of medium and low voltage cables.",
|
||||
"name": "Cable Civil Engineering",
|
||||
"description": "Classic trench construction, professional laying and cable assembly (high, medium, and low voltage) up to 110 kV.",
|
||||
"provider": { "@type": "Organization", "name": "E-TIB GmbH" }
|
||||
},
|
||||
{
|
||||
|
||||
@@ -1,14 +0,0 @@
|
||||
---
|
||||
title: "Broadband Expansion FTTH, Börde District"
|
||||
client: "EKN Breitband GmbH & Co. KG"
|
||||
date: "2019-05-01"
|
||||
dateString: "Since 05/2019"
|
||||
location: "Börde District"
|
||||
featuredImage: "/assets/photos/etib_ingenieure_tiefbau_solar_pv_planung_vermessung_gis-294.jpg"
|
||||
---
|
||||
|
||||
- 109,000 m production of cable route (civil engineering/HDD)
|
||||
- 63 units installation of network distributors
|
||||
- 747 units production of house connections
|
||||
- Coordination and realization of the entire route guidance
|
||||
- Documentation and acceptance of the house connections
|
||||
@@ -1,13 +0,0 @@
|
||||
---
|
||||
title: "Broadband Expansion FTTH, Bomlitz / Schwarmstedt"
|
||||
client: "inexio Informationstechnologie und Telekommunikation GmbH"
|
||||
date: "2018-08-01"
|
||||
dateString: "08/2018 to 03/2021"
|
||||
location: "29699 Bomlitz / 29690 Schwarmstedt"
|
||||
featuredImage: "/assets/photos/Etib_E-tib_Tiefbau_Guben_Netzanbindung_Energie-60.jpg"
|
||||
---
|
||||
|
||||
- 88,890 m production of cable route (civil engineering/HDD)
|
||||
- 23 units installation of multi-functional cabinets
|
||||
- 52 units installation of network distributors
|
||||
- 571 units production of house connections
|
||||
17
content/en/referenzen/dettmannsdorf.mdx
Normal file
17
content/en/referenzen/dettmannsdorf.mdx
Normal file
@@ -0,0 +1,17 @@
|
||||
---
|
||||
title: "PV Plant Dettmannsdorf"
|
||||
client: "Energiekontor AG"
|
||||
date: "2026-06-01"
|
||||
dateString: "01/2025 to 06/2026"
|
||||
location: "18334 Dettmannsdorf"
|
||||
featuredImage: "/assets/photos/DSC08653.JPG"
|
||||
---
|
||||
|
||||
- Excavation and backfilling of 12,300 m cable trench
|
||||
- 14,200 m HDD directional drilling d 225 / d 200 / d 180
|
||||
- 26,500 m laying of MV cable 630 mm², 18/30 kV
|
||||
- 7,100 m laying of MV cable 1000 mm², 18/30 kV
|
||||
- 26,500 m laying of PE protective pipe 50 x 4.6 mm
|
||||
- 26,500 m fiber optic cable blowing, 12 fibers
|
||||
- All medium voltage assembly works
|
||||
- VLF / Sheath testing / OTDR
|
||||
@@ -1,19 +0,0 @@
|
||||
---
|
||||
title: "Cable Connection U30 - T10, Eisenhüttenstadt"
|
||||
client: "ArcelorMittal Eisenhüttenstadt GmbH"
|
||||
date: "2019-07-01"
|
||||
dateString: "07/2019 to 12/2019"
|
||||
location: "15890 Eisenhüttenstadt"
|
||||
featuredImage: "/assets/photos/Etib_E-tib_Tiefbau_Guben_Netzanbindung_Energie_Vermessung_(24_von_99)_groß2.jpg"
|
||||
---
|
||||
|
||||
- 2,095 m cable trench excavation and backfilling
|
||||
- 180 m horizontal directional drilling d 160 + d 50
|
||||
- 5,700 m delivery and installation of MV cable 240 mm², 18/30 kV
|
||||
- 3,000 m delivery and installation of PE protection pipe 50 x 4.6 mm
|
||||
- 3,000 m delivery and blowing in of FO cable, 12 fibers
|
||||
- 3,000 m delivery and installation of control cable, 0.6/1 kV
|
||||
- 16 sets delivery and assembly of MV connection joint 240 mm², 18/30 kV
|
||||
- 1 unit delivery and assembly of FO connection joint, 12 fibers
|
||||
- 4 sets delivery and assembly of MV T-connectors 240 mm², 18/30 kV
|
||||
- Main testing / sheath testing / OTDR measurement
|
||||
@@ -1,16 +0,0 @@
|
||||
---
|
||||
title: "New Cable Route, Forst"
|
||||
client: "Mitteldeutsche Netzgesellschaft Strom mbH"
|
||||
date: "2020-03-01"
|
||||
dateString: "03/2020 to 09/2020"
|
||||
location: "03149 Forst"
|
||||
featuredImage: "/assets/photos/DSC02156.jpg"
|
||||
---
|
||||
|
||||
- 2,984 m cable trench excavation and backfilling
|
||||
- 945 m horizontal directional drilling d 160 + d 50
|
||||
- 3,929 m installation of MV cable 240 mm², 12/20 kV
|
||||
- 3,929 m installation of PE protection pipe 50 x 4.6 mm
|
||||
- 11 sets assembly of MV connection joint 240 mm², 12/20 kV
|
||||
- 1 set assembly of MV end termination 240 mm², 12/20 kV
|
||||
- 2,000 m dismantling of overhead line (incl. 16 poles)
|
||||
@@ -1,19 +0,0 @@
|
||||
---
|
||||
title: "PV System Feed-in, Görne"
|
||||
client: "EVH GmbH"
|
||||
date: "2020-05-01"
|
||||
dateString: "05/2020 to 07/2020"
|
||||
location: "14728 Görne"
|
||||
featuredImage: "/assets/photos/DSC08744.JPG"
|
||||
---
|
||||
|
||||
- 4,215 m cable trench excavation and backfilling
|
||||
- 1,285 m horizontal directional drilling d 140 + d 50
|
||||
- 5,500 m installation of MV cable 300 mm², 12/20 kV
|
||||
- 4,500 m installation of MV cable 300 mm², 12/20 kV by cable plow
|
||||
- 10,000 m installation of PE protection pipe 50 x 4.6 mm
|
||||
- 10,000 m blowing in of FO cable, 12 fibers
|
||||
- 3 units delivery and assembly of FO connection joint, 12 fibers
|
||||
- 16 sets assembly of MV connection joint 300 mm², 12/20 kV
|
||||
- 4 sets assembly of MV T-connectors 300 mm², 12/20 kV
|
||||
- Sheath testing, VLF testing, OTDR measurement
|
||||
17
content/en/referenzen/jevenstedt.mdx
Normal file
17
content/en/referenzen/jevenstedt.mdx
Normal file
@@ -0,0 +1,17 @@
|
||||
---
|
||||
title: "110 kV Cable Route Jevenstedt OT Altenkattbek"
|
||||
client: "wpd GmbH"
|
||||
date: "2026-03-01"
|
||||
dateString: "since 03/2026"
|
||||
location: "24808 Jevenstedt"
|
||||
featuredImage: "/assets/photos/DSC01137.JPG"
|
||||
---
|
||||
|
||||
- Excavation and backfilling of 500 m cable trench
|
||||
- 4,500 m plowing of 3 x PE protective pipe d 160
|
||||
- 3,200 m HDD directional drilling d 160
|
||||
- 8,500 m laying of HV cable 1,000 mm² 64/110 kV
|
||||
- 11 sets of connection joints 1,000 mm² 64/110 kV
|
||||
- 2 sets of outdoor terminations 1,000 mm² 64/110 kV
|
||||
- 8,500 m fiber optic cable blowing, 12 fibers
|
||||
- High-voltage testing with PD measurement/OTDR
|
||||
15
content/en/referenzen/ketzin.mdx
Normal file
15
content/en/referenzen/ketzin.mdx
Normal file
@@ -0,0 +1,15 @@
|
||||
---
|
||||
title: "Grid Expansion Commercial Area Ketzin"
|
||||
client: "E.DIS Netz GmbH"
|
||||
date: "2025-06-01"
|
||||
dateString: "01/2025 to 06/2025"
|
||||
location: "14669 Ketzin"
|
||||
featuredImage: "/assets/photos/DJI_0048.JPG"
|
||||
---
|
||||
|
||||
- Excavation and backfilling of 1,600 m cable trench
|
||||
- 7,500 m HDD directional drilling d 180
|
||||
- 11,200 m laying of MV cable 240 mm², 12/20 kV
|
||||
- 11,200 m laying of PE protective pipe 50 x 4.6 mm
|
||||
- All medium voltage assembly works
|
||||
- VLF testing
|
||||
17
content/en/referenzen/ostbevern.mdx
Normal file
17
content/en/referenzen/ostbevern.mdx
Normal file
@@ -0,0 +1,17 @@
|
||||
---
|
||||
title: "Wind Farm Ostbevern"
|
||||
client: "GP Joule Anlagenbau GmbH & Co. KG"
|
||||
date: "2026-03-01"
|
||||
dateString: "02/2025 to 03/2026"
|
||||
location: "48346 Ostbevern"
|
||||
featuredImage: "/assets/photos/Etib_E-tib_Tiefbau_Guben_Netzanbindung_Energie-100.jpg"
|
||||
---
|
||||
|
||||
- Excavation and backfilling of 4,100 m cable trench
|
||||
- 3,200 m HDD directional drilling d 180 + d 50
|
||||
- 3,200 m laying of MV cable 150 mm², 18/30 kV
|
||||
- 4,000 m laying of MV cable 300 mm², 18/30 kV
|
||||
- 7,500 m laying of PE protective pipe 50 x 4.6 mm
|
||||
- 7,500 m fiber optic cable blowing, 12 fibers
|
||||
- All medium voltage assembly works
|
||||
- VLF / Sheath testing / OTDR
|
||||
17
content/en/referenzen/petershagen.mdx
Normal file
17
content/en/referenzen/petershagen.mdx
Normal file
@@ -0,0 +1,17 @@
|
||||
---
|
||||
title: "PV Plant Petershagen"
|
||||
client: "NaturStromAnlagen GmbH"
|
||||
date: "2025-02-01"
|
||||
dateString: "04/2024 to 02/2025"
|
||||
location: "15326 Petershagen"
|
||||
featuredImage: "/assets/photos/DSC01123.JPG"
|
||||
---
|
||||
|
||||
- Excavation and backfilling of 12,000 m cable trench
|
||||
- 3,000 m HDD directional drilling d 225 / d 200 / d 160
|
||||
- 10,000 m laying of MV cable 630 mm², 18/30 kV
|
||||
- 17,000 m laying of MV cable 800 mm², 18/30 kV
|
||||
- 10,000 m laying of PE protective pipe 50 x 4.6 mm
|
||||
- 10,000 m fiber optic cable blowing, 12 fibers
|
||||
- All medium voltage assembly works
|
||||
- VLF / Sheath testing / OTDR
|
||||
17
content/en/referenzen/proetzel.mdx
Normal file
17
content/en/referenzen/proetzel.mdx
Normal file
@@ -0,0 +1,17 @@
|
||||
---
|
||||
title: "PV Plant Prötzel OT Sternebeck"
|
||||
client: "Trianel GmbH"
|
||||
date: "2025-08-01"
|
||||
dateString: "02/2025 to 08/2025"
|
||||
location: "15345 Prötzel"
|
||||
featuredImage: "/assets/photos/DJI_0243.JPG"
|
||||
---
|
||||
|
||||
- Excavation and backfilling of 2,600 m cable trench
|
||||
- 3,800 m HDD directional drilling d 225 / d 200 / d 160
|
||||
- 7,500 m laying of MV cable 240 mm², 18/30 kV
|
||||
- 8,800 m laying of MV cable 800 mm², 18/30 kV
|
||||
- 15,800 m laying of PE protective pipe 50 x 4.6 mm
|
||||
- 15,800 m fiber optic cable blowing, 12 fibers
|
||||
- All medium voltage assembly works
|
||||
- VLF / Sheath testing / OTDR
|
||||
@@ -1,17 +0,0 @@
|
||||
---
|
||||
title: "Broadband Expansion FTTC, Spreewald Planning Region"
|
||||
client: "Telekom Deutschland GmbH"
|
||||
date: "2017-09-01"
|
||||
dateString: "09/2017 to 01/2018"
|
||||
location: "Spreewald Planning Region"
|
||||
featuredImage: "/assets/photos/DSC01129.JPG"
|
||||
---
|
||||
|
||||
- 4,006 m cable trench excavation and backfilling
|
||||
- 4,006 m installation of PE protection pipe 50 x 4.6 mm
|
||||
- 13,008 m horizontal directional drilling D 50
|
||||
- 94,951 m blowing in of cables/pipes (unoccupied)
|
||||
- 42 units installation of multi-functional cabinets
|
||||
- Setup of energy connection pillars and electrical systems 230V
|
||||
- Coordination with utility companies and commissioning of the electrical systems
|
||||
- Surface and civil engineering work for multi-function enclosures
|
||||
@@ -42,7 +42,7 @@ layout: "fullBleed"
|
||||
{
|
||||
id: "martin-polan",
|
||||
name: "Martin Polan",
|
||||
position: "Foreman",
|
||||
position: "Site Management",
|
||||
email: "m.polan@e-tib.com",
|
||||
phone: "+49 171 3868167",
|
||||
image: "/assets/photos/team/martin.jpg"
|
||||
|
||||
@@ -27,12 +27,12 @@ layout: "fullBleed"
|
||||
Since our foundation in 2015 in Guben, we have made it our mission to actively shape the expansion of critical infrastructure.
|
||||
</div>
|
||||
<div>
|
||||
With over 50 dedicated professionals and a state-of-the-art machinery park, we master even the most demanding projects in cable civil engineering, directional drilling, and grid assembly. Reliability, adherence to schedules, and the highest quality standards are our foundation.
|
||||
With approx. 100 dedicated professionals and a state-of-the-art machinery park, we master even the most demanding projects in cable civil engineering, directional drilling, and grid assembly. Reliability, adherence to schedules, and the highest quality standards are our foundation.
|
||||
</div>
|
||||
</div>
|
||||
<div className="grid grid-cols-2 gap-6">
|
||||
<div className="bg-white p-8 rounded-2xl shadow-sm border border-neutral-100">
|
||||
<div className="text-4xl font-extrabold text-primary mb-2">50+</div>
|
||||
<div className="text-4xl font-extrabold text-primary mb-2">100+</div>
|
||||
<div className="text-neutral-dark font-semibold">Employees</div>
|
||||
</div>
|
||||
<div className="bg-white p-8 rounded-2xl shadow-sm border border-neutral-100">
|
||||
@@ -52,7 +52,7 @@ layout: "fullBleed"
|
||||
</div>
|
||||
</div>
|
||||
|
||||
<InteractiveGermanyMap isHero={true} badge="Nationwide Presence" title="Infrastructure for an entire country" description="Since 2023, we have proven in over 100 projects across Germany that we reliably implement infrastructure projects of any scale." />
|
||||
<InteractiveGermanyMap isHero={true} badge="Nationwide Presence" title="Infrastructure for an entire country" description="Since 2016, we have proven in over 200 projects across Germany that we reliably implement infrastructure projects of any scale." />
|
||||
|
||||
<CompanyTimeline />
|
||||
|
||||
|
||||
Reference in New Issue
Block a user