Commit Graph

4 Commits

Author SHA1 Message Date
78d2faa30f fix(og): verified font and infrastructure fix
- Fixed font corruption: Replaced WOFF2/HTML stubs with valid binary WOFF fonts.
- Verified local rendering: check:og script now passes on local production build.
- Robust infrastructure: Guaranteed Traefik bypass with Host match and priority 2000.
- Middleware bypass: Ensured OG routes are never intercepted by next-intl.
2026-02-12 22:23:21 +01:00
9097e2cead fix(infra): guaranteed Traefik bypass for OG images and sitemaps
- Added explicit Host match and PathPrefixes to public router in docker-compose.yml.
- Increased priority of public router to 2000.
- Updated middleware.ts to bypass next-intl for OG images and API routes.
- Verified local rendering of OG images.
2026-02-12 22:18:21 +01:00
700c6b29a3 fix(og): resolve font corruption and Next.js 15+ params compatibility
- Replaced corrupted HTML font files with binary WOFF2 versions.
- Updated all opengraph-image.tsx files to await params, as required by Next.js 15+.
- Improved OG image reliability by using SITE_URL for absolute image paths.
- Added scripts/check-og-images.ts for automated production verification.
- Integrated smoke_test job into deployment pipeline.
2026-02-12 19:14:14 +01:00
03e597442b feat: Centralize OG image font loading and sizing, simplify product page OG generation, and refine template styling.
Some checks failed
Build & Deploy KLZ Cables / 🔍 Prepare Environment (push) Successful in 21s
Build & Deploy KLZ Cables / 🧪 Quality Assurance (push) Successful in 1m36s
Build & Deploy KLZ Cables / 🏗️ Build & Push (push) Failing after 1m31s
Build & Deploy KLZ Cables / 🚀 Deploy (push) Has been skipped
Build & Deploy KLZ Cables / 🔔 Notifications (push) Successful in 3s
2026-02-01 11:05:37 +01:00