Commit Graph

10 Commits

Author SHA1 Message Date
4058abab13 fix(og): resolve font corruption and Next.js 15+ params compatibility
Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 11s
Build & Deploy / 🧪 QA (push) Successful in 1m20s
Build & Deploy / 🏗️ Build (push) Successful in 7m10s
Build & Deploy / 🚀 Deploy (push) Successful in 38s
Build & Deploy / 🧪 Smoke Test (push) Failing after 42s
Build & Deploy / 🔔 Notify (push) Successful in 2s
- Replaced corrupted HTML font files with binary WOFF2 versions.
- Updated all opengraph-image.tsx files to await params, as required by Next.js 15+.
- Improved OG image reliability by using SITE_URL for absolute image paths.
- Added scripts/check-og-images.ts for automated production verification.
- Integrated smoke_test job into deployment pipeline.
2026-02-12 19:14:14 +01:00
eb388610de chore: align ecosystem to Next.js 16.1.6 and v1.6.0, migrate to ESLint 9 Flat Config
Some checks failed
CI - Lint, Typecheck & Test / quality-assurance (push) Failing after 30s
2026-02-09 23:23:31 +01:00
03e597442b feat: Centralize OG image font loading and sizing, simplify product page OG generation, and refine template styling.
Some checks failed
Build & Deploy KLZ Cables / 🔍 Prepare Environment (push) Successful in 21s
Build & Deploy KLZ Cables / 🧪 Quality Assurance (push) Successful in 1m36s
Build & Deploy KLZ Cables / 🏗️ Build & Push (push) Failing after 1m31s
Build & Deploy KLZ Cables / 🚀 Deploy (push) Has been skipped
Build & Deploy KLZ Cables / 🔔 Notifications (push) Successful in 3s
2026-02-01 11:05:37 +01:00
8a80eb7b9a og
All checks were successful
Build & Deploy KLZ Cables / build-and-deploy (push) Successful in 3m55s
2026-01-31 10:35:07 +01:00
33ed13d255 og
Some checks failed
Build & Deploy KLZ Cables / build-and-deploy (push) Failing after 3m28s
2026-01-31 10:25:25 +01:00
0f5811edb9 og
Some checks failed
Build & Deploy KLZ Cables / build-and-deploy (push) Failing after 1m47s
2026-01-31 10:21:24 +01:00
a2f94f15bc og
All checks were successful
Build & Deploy KLZ Cables / build-and-deploy (push) Successful in 4m48s
2026-01-29 17:26:02 +01:00
bb7d17001b og
All checks were successful
Build & Deploy KLZ Cables / build-and-deploy (push) Successful in 3m57s
2026-01-29 16:33:04 +01:00
36e2a84a54 cleanup 2026-01-16 18:24:45 +01:00
292975299d initial migration 2025-12-28 23:28:31 +01:00