chore: integrate mdx validation and fix syntax errors in blog posts
All checks were successful
Build & Deploy / 🔍 Prepare (push) Successful in 16s
Build & Deploy / 🧪 QA (push) Successful in 1m49s
Build & Deploy / 🏗️ Build (push) Successful in 7m0s
Build & Deploy / 🚀 Deploy (push) Successful in 15s
Build & Deploy / 🧪 Smoke Test (push) Successful in 1m0s
Build & Deploy / 🔔 Notify (push) Successful in 2s
All checks were successful
Build & Deploy / 🔍 Prepare (push) Successful in 16s
Build & Deploy / 🧪 QA (push) Successful in 1m49s
Build & Deploy / 🏗️ Build (push) Successful in 7m0s
Build & Deploy / 🚀 Deploy (push) Successful in 15s
Build & Deploy / 🧪 Smoke Test (push) Successful in 1m0s
Build & Deploy / 🔔 Notify (push) Successful in 2s
This commit is contained in:
@@ -31,19 +31,12 @@ Integrating wind farms into the power grid requires a systemic approach. Sound p
|
||||
Professional planning not only ensures security of supply, but also reduces operating costs in the long term and enables flexible responses to grid requirements.
|
||||
You can find more information here on how wind energy basically works:
|
||||
|
||||
<VisualLinkPreview
|
||||
url="
|
||||
<VisualLinkPreview
|
||||
url="https://www.e-werk-mittelbaden.de/wie-funktioniert-windenergie"
|
||||
title="Wie funktioniert Windenergie? - Einfach erklärt | E-Werk Mittelbaden"
|
||||
summary="Erfahren Sie, wie Windenergie funktioniert und wie sie zur nachhaltigen Energieversorgung beiträgt. Jetzt informieren!"
|
||||
image="https://www.e-werk-mittelbaden.de/sites/default/files/media_image/2024-12/DJI_20231105012629_0029_D-HDR.jpg"
|
||||
/>
|
||||
"
|
||||
title="Wie funktioniert Windenergie?"
|
||||
summary="- Einfach erklärt | E-Werk MittelbadenErfahren Sie, wie Windenergie funktioniert und wie sie zur nachhaltigen Energieversorgung beiträgt. Jetzt informieren!"
|
||||
image="https://www.e-werk-mittelbaden.de/sites/default/files/media_image/2024-12/DJI_20231105012629_0029_D-HDR.jpg"
|
||||
/>
|
||||
<blockquote>
|
||||
**Those who want to transport climate-friendly energy must also build in a climate-conscious way.**
|
||||
</blockquote>
|
||||
@@ -60,19 +53,12 @@ A well-considered dismantling does not begin with removal, but with a **forward-
|
||||
This is not only about **ecological aspects** – a planned dismantling also makes sense **economically**. Projects that are **systematically designed for dismantling** avoid high **disposal costs** and meet future **regulatory requirements** much more easily.
|
||||
Overall, it becomes clear: **Sustainability does not end at the grid connection.** It covers the **entire life cycle** – right up to the **last recycled cable**. Those who think about **infrastructure holistically** think it through **to the end**.
|
||||
In the following article, you can find out how, for example, wind turbines are recycled:
|
||||
<VisualLinkPreview
|
||||
url="
|
||||
<VisualLinkPreview
|
||||
url="https://www.enbw.com/unternehmen/themen/windkraft/windrad-recycling.html"
|
||||
title="Recycling von Windrädern | EnBW"
|
||||
summary="Wie funktioniert das Recycling von Windrädern? Erfahren Sie mehr über Herausforderungen und die neuesten Methoden."
|
||||
image="https://www.enbw.com/media/image-proxy/1600x914,q70,focus60x67,zoom1.45/https://www.enbw.com/media/presse/images/newsroom/windenergie/rueckbau-windpark-hemme-3_1743678993586.jpg"
|
||||
/>
|
||||
"
|
||||
title="Recycling von Windrädern | EnBW"
|
||||
summary="Wie funktioniert das Recycling von Windrädern? Erfahren Sie mehr über Herausforderungen und die neuesten Methoden."
|
||||
image="https://www.enbw.com/media/image-proxy/1600x914,q70,focus60x67,zoom1.45/https://www.enbw.com/media/presse/images/newsroom/windenergie/rueckbau-windpark-hemme-3_1743678993586.jpg"
|
||||
/>
|
||||
## Reliable Grids Don’t Happen by Accident
|
||||
The **requirements** for today’s **energy grids** are constantly **increasing**. Especially for wind power projects realized in remote or structurally weak regions, a stable grid design is crucial. It is no longer enough to transmit power from A to B. The **infrastructure** must also work in unforeseen situations – during peak loads, maintenance or external disruptions.
|
||||
This **resilience** cannot be retrofitted. It must be considered right from the planning stage. **Grid architecture** that can flexibly respond to different operating situations is not a technical extra, but a fundamental part of **sustainable project development**. The ability to switch, use alternative routes, or throttle power without causing supply outages is particularly important.
|
||||
|
||||
Reference in New Issue
Block a user