title: "Wind Farm Ostbevern"
|
|
client: "GP Joule Anlagenbau GmbH & Co. KG"
|
|
date: "2026-03-01"
|
|
dateString: "02/2025 to 03/2026"
|
|
location: "48346 Ostbevern"
|
|
---
|
|
|
|
- Excavation and backfilling of 4,100 m cable trench
|
|
- 3,200 m HDD directional drilling d 180 + d 50
|
|
- 3,200 m laying of MV cable 150 mm², 18/30 kV
|
|
- 4,000 m laying of MV cable 300 mm², 18/30 kV
|
|
- 7,500 m laying of PE protective pipe 50 x 4.6 mm
|
|
- 7,500 m fiber optic cable blowing, 12 fibers
|
|
- All medium voltage assembly works
|
|
- VLF / Sheath testing / OTDR
|