Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 23s
Build & Deploy / 🧪 QA (push) Failing after 1m8s
Build & Deploy / 🏗️ Build (push) Has been skipped
Build & Deploy / 🚀 Deploy (push) Has been skipped
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 1s
- Rewrote all 5 competence pages (Kabeltiefbau, Bohrtechnik, Glasfaser, Planung, Vermessung) with factual data from references - Unified brand colors: replaced toxic neon green with brand-aligned teal (#10a379) - Fixed ReferencesSlider injection in dynamic MDX pages - Enhanced Footer with icon parity, improved branding placement, and unified hover effects - Refined Header with 3D micro-animations and improved dropdown visibility - Fixed localized tracking API (rewrites for /stats/api/send) - Resolved ReferenceErrors in InteractiveGermanyMap and Header state management - Cleaned reference titles and truncated metadata in lists
18 lines
713 B
Plaintext
18 lines
713 B
Plaintext
---
|
|
title: "Broadband Expansion FTTC, Spreewald Planning Region"
|
|
client: "Telekom Deutschland GmbH"
|
|
date: "2017-09-01"
|
|
dateString: "09/2017 to 01/2018"
|
|
location: "Spreewald Planning Region"
|
|
featuredImage: "/assets/photos/DSC01129.JPG"
|
|
---
|
|
|
|
- 4,006 m cable trench excavation and backfilling
|
|
- 4,006 m installation of PE protection pipe 50 x 4.6 mm
|
|
- 13,008 m horizontal directional drilling D 50
|
|
- 94,951 m blowing in of cables/pipes (unoccupied)
|
|
- 42 units installation of multi-functional cabinets
|
|
- Setup of energy connection pillars and electrical systems 230V
|
|
- Coordination with utility companies and commissioning of the electrical systems
|
|
- Surface and civil engineering work for multi-function enclosures
|