Files
e-tib.com/content/de/referenzen/goerne.mdx
Marc Mintel 843d61cd5d
Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 23s
Build & Deploy / 🧪 QA (push) Failing after 1m8s
Build & Deploy / 🏗️ Build (push) Has been skipped
Build & Deploy / 🚀 Deploy (push) Has been skipped
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 1s
feat: overhaul competence pages, unify brand colors, and polish site integrity
- Rewrote all 5 competence pages (Kabeltiefbau, Bohrtechnik, Glasfaser, Planung, Vermessung) with factual data from references
- Unified brand colors: replaced toxic neon green with brand-aligned teal (#10a379)
- Fixed ReferencesSlider injection in dynamic MDX pages
- Enhanced Footer with icon parity, improved branding placement, and unified hover effects
- Refined Header with 3D micro-animations and improved dropdown visibility
- Fixed localized tracking API (rewrites for /stats/api/send)
- Resolved ReferenceErrors in InteractiveGermanyMap and Header state management
- Cleaned reference titles and truncated metadata in lists
2026-05-15 21:07:25 +02:00

20 lines
702 B
Plaintext

---
title: "Einspeisung PV-Anlage, Görne"
client: "EVH GmbH"
date: "2020-05-01"
dateString: "05/2020 bis 07/2020"
location: "14728 Görne"
featuredImage: "/assets/photos/DSC08744.JPG"
---
- 4.215 m Kabelgraben ausheben und verfüllen
- 1.285 m Horizontalspülbohrung d 140 + d 50
- 5.500 m Verlegung MS-Kabel 300 mm², 12/20 kV
- 4.500 m Verlegung MS-Kabel 300 mm², 12/20 kV mittels Kabelpflug
- 10.000 m Verlegung PE-Schutzrohr 50 x 4,6 mm
- 10.000 m Einblasen LWL-Kabel, 12 Fasern
- 3 Stück Lieferung und Montage LWL-Verbindungsmuffe, 12 Fasern
- 16 Satz Montage MS-Verbindungsmuffe 300 mm², 12/20 kV
- 4 Satz Montage MS-T-Stecker 300 mm², 12/20 kV
- Mantelprüfung, VLF-Prüfung, OTDR-Messung