Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 23s
Build & Deploy / 🧪 QA (push) Failing after 1m8s
Build & Deploy / 🏗️ Build (push) Has been skipped
Build & Deploy / 🚀 Deploy (push) Has been skipped
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 1s
- Rewrote all 5 competence pages (Kabeltiefbau, Bohrtechnik, Glasfaser, Planung, Vermessung) with factual data from references - Unified brand colors: replaced toxic neon green with brand-aligned teal (#10a379) - Fixed ReferencesSlider injection in dynamic MDX pages - Enhanced Footer with icon parity, improved branding placement, and unified hover effects - Refined Header with 3D micro-animations and improved dropdown visibility - Fixed localized tracking API (rewrites for /stats/api/send) - Resolved ReferenceErrors in InteractiveGermanyMap and Header state management - Cleaned reference titles and truncated metadata in lists
17 lines
566 B
Plaintext
17 lines
566 B
Plaintext
---
|
|
title: "Neubau Kabeltrasse, Forst"
|
|
client: "Mitteldeutsche Netzgesellschaft Strom mbH"
|
|
date: "2020-03-01"
|
|
dateString: "03/2020 bis 09/2020"
|
|
location: "03149 Forst"
|
|
featuredImage: "/assets/photos/DSC02156.jpg"
|
|
---
|
|
|
|
- 2984 m Kabelgraben ausheben und verfüllen
|
|
- 945 m Horizontalspülbohrung d 160 + d 50
|
|
- 3.929 m Verlegung MS-Kabel 240 mm², 12/20 kV
|
|
- 3.929 m Verlegung PE-Schutzrohr 50 x 4,6 mm
|
|
- 11 Satz Montage MS-Verbindungsmuffe 240 mm², 12/20 kV
|
|
- 1 Satz Montage MS-Endverschluss 240 mm², 12/20 kV
|
|
- 2.000 m Rückbau Freileitung (inkl. 16 Stück Maste)
|