Files
e-tib.com/content/de/referenzen/forst.mdx
Marc Mintel 843d61cd5d
Some checks failed
Build & Deploy / 🔍 Prepare (push) Successful in 23s
Build & Deploy / 🧪 QA (push) Failing after 1m8s
Build & Deploy / 🏗️ Build (push) Has been skipped
Build & Deploy / 🚀 Deploy (push) Has been skipped
Build & Deploy / 🧪 Post-Deploy Verification (push) Has been skipped
Build & Deploy / 🔔 Notify (push) Successful in 1s
feat: overhaul competence pages, unify brand colors, and polish site integrity
- Rewrote all 5 competence pages (Kabeltiefbau, Bohrtechnik, Glasfaser, Planung, Vermessung) with factual data from references
- Unified brand colors: replaced toxic neon green with brand-aligned teal (#10a379)
- Fixed ReferencesSlider injection in dynamic MDX pages
- Enhanced Footer with icon parity, improved branding placement, and unified hover effects
- Refined Header with 3D micro-animations and improved dropdown visibility
- Fixed localized tracking API (rewrites for /stats/api/send)
- Resolved ReferenceErrors in InteractiveGermanyMap and Header state management
- Cleaned reference titles and truncated metadata in lists
2026-05-15 21:07:25 +02:00

17 lines
566 B
Plaintext

---
title: "Neubau Kabeltrasse, Forst"
client: "Mitteldeutsche Netzgesellschaft Strom mbH"
date: "2020-03-01"
dateString: "03/2020 bis 09/2020"
location: "03149 Forst"
featuredImage: "/assets/photos/DSC02156.jpg"
---
- 2984 m Kabelgraben ausheben und verfüllen
- 945 m Horizontalspülbohrung d 160 + d 50
- 3.929 m Verlegung MS-Kabel 240 mm², 12/20 kV
- 3.929 m Verlegung PE-Schutzrohr 50 x 4,6 mm
- 11 Satz Montage MS-Verbindungsmuffe 240 mm², 12/20 kV
- 1 Satz Montage MS-Endverschluss 240 mm², 12/20 kV
- 2.000 m Rückbau Freileitung (inkl. 16 Stück Maste)