title: "110 kV Cable Route Jevenstedt OT Altenkattbek"
client: "wpd GmbH"
date: "2026-03-01"
dateString: "since 03/2026"
location: "24808 Jevenstedt"
featuredImage: "/assets/photos/DJI_0037.JPG"
---
- Excavation and backfilling of 500 m cable trench
- 4,500 m plowing of 3 x PE protective pipe d 160
- 3,200 m HDD directional drilling d 160
- 8,500 m laying of HV cable 1,000 mm² 64/110 kV
- 11 sets of connection joints 1,000 mm² 64/110 kV
- 2 sets of outdoor terminations 1,000 mm² 64/110 kV
- 8,500 m fiber optic cable blowing, 12 fibers
- High-voltage testing with PD measurement/OTDR