title: "PV Plant Prötzel OT Sternebeck"
|
|
client: "Trianel GmbH"
|
|
date: "2025-08-01"
|
|
dateString: "02/2025 to 08/2025"
|
|
location: "15345 Prötzel"
|
|
featuredImage: "/assets/photos/etib_ingenieure_tiefbau_solar_pv_planung_vermessung_gis-294.jpg"
|
|
---
|
|
|
|
- Excavation and backfilling of 2,600 m cable trench
|
|
- 3,800 m HDD directional drilling d 225 / d 200 / d 160
|
|
- 7,500 m laying of MV cable 240 mm², 18/30 kV
|
|
- 8,800 m laying of MV cable 800 mm², 18/30 kV
|
|
- 15,800 m laying of PE protective pipe 50 x 4.6 mm
|
|
- 15,800 m fiber optic cable blowing, 12 fibers
|
|
- All medium voltage assembly works
|
|
- VLF / Sheath testing / OTDR
|