Files
e-tib.com/content/en/referenzen/ketzin.mdx
Marc Mintel 309a53624e
All checks were successful
Build & Deploy / 🔍 Prepare (push) Successful in 23s
Build & Deploy / 🧪 QA (push) Successful in 1m3s
Build & Deploy / 🏗️ Build (push) Successful in 1m51s
Build & Deploy / 🚀 Deploy (push) Successful in 27s
Build & Deploy / 🧪 Post-Deploy Verification (push) Successful in 44s
Build & Deploy / 🔔 Notify (push) Successful in 2s
feat: manually assign appropriate reference images as requested by client
2026-06-16 14:48:25 +02:00

16 lines
490 B
Plaintext

---
title: "Grid Expansion Commercial Area Ketzin"
client: "E.DIS Netz GmbH"
date: "2025-06-01"
dateString: "01/2025 to 06/2025"
location: "14669 Ketzin"
featuredImage: "/assets/photos/Etib_E-tib_Tiefbau_Guben_Netzanbindung_Energie-14.jpg"
---
- Excavation and backfilling of 1,600 m cable trench
- 7,500 m HDD directional drilling d 180
- 11,200 m laying of MV cable 240 mm², 12/20 kV
- 11,200 m laying of PE protective pipe 50 x 4.6 mm
- All medium voltage assembly works
- VLF testing