- Rewrote all 5 competence pages (Kabeltiefbau, Bohrtechnik, Glasfaser, Planung, Vermessung) with factual data from references - Unified brand colors: replaced toxic neon green with brand-aligned teal (#10a379) - Fixed ReferencesSlider injection in dynamic MDX pages - Enhanced Footer with icon parity, improved branding placement, and unified hover effects - Refined Header with 3D micro-animations and improved dropdown visibility - Fixed localized tracking API (rewrites for /stats/api/send) - Resolved ReferenceErrors in InteractiveGermanyMap and Header state management - Cleaned reference titles and truncated metadata in lists
20 lines
702 B
Plaintext
20 lines
702 B
Plaintext
---
|
|
title: "Einspeisung PV-Anlage, Görne"
|
|
client: "EVH GmbH"
|
|
date: "2020-05-01"
|
|
dateString: "05/2020 bis 07/2020"
|
|
location: "14728 Görne"
|
|
featuredImage: "/assets/photos/DSC08744.JPG"
|
|
---
|
|
|
|
- 4.215 m Kabelgraben ausheben und verfüllen
|
|
- 1.285 m Horizontalspülbohrung d 140 + d 50
|
|
- 5.500 m Verlegung MS-Kabel 300 mm², 12/20 kV
|
|
- 4.500 m Verlegung MS-Kabel 300 mm², 12/20 kV mittels Kabelpflug
|
|
- 10.000 m Verlegung PE-Schutzrohr 50 x 4,6 mm
|
|
- 10.000 m Einblasen LWL-Kabel, 12 Fasern
|
|
- 3 Stück Lieferung und Montage LWL-Verbindungsmuffe, 12 Fasern
|
|
- 16 Satz Montage MS-Verbindungsmuffe 300 mm², 12/20 kV
|
|
- 4 Satz Montage MS-T-Stecker 300 mm², 12/20 kV
|
|
- Mantelprüfung, VLF-Prüfung, OTDR-Messung
|