title: "110 kV Cable Route Jevenstedt OT Altenkattbek"
|
|
client: "wpd GmbH"
|
|
date: "2026-03-01"
|
|
dateString: "since 03/2026"
|
|
location: "24808 Jevenstedt"
|
|
featuredImage: "/assets/photos/DJI_0037.JPG"
|
|
---
|
|
|
|
- Excavation and backfilling of 500 m cable trench
|
|
- 4,500 m plowing of 3 x PE protective pipe d 160
|
|
- 12,000 m HDD directional drilling d 160
|
|
- 8,500 m laying of HV cable 1,000 mm² 64/110 kV
|
|
- 11 sets of connection joints 1,000 mm² 64/110 kV
|
|
- 2 sets of outdoor terminations 1,000 mm² 64/110 kV
|
|
- 8,500 m fiber optic cable blowing, 12 fibers
|
|
- High-voltage testing with PD measurement/OTDR
|