Files
e-tib.com/content/en/referenzen/jevenstedt.mdx
Marc Mintel 6de8ad8516
All checks were successful
Build & Deploy / 🔍 Prepare (push) Successful in 53s
Build & Deploy / 🧪 QA (push) Successful in 1m25s
Build & Deploy / 🏗️ Build (push) Successful in 2m41s
Build & Deploy / 🚀 Deploy (push) Successful in 32s
Build & Deploy / 🧪 Post-Deploy Verification (push) Successful in 56s
Build & Deploy / 🔔 Notify (push) Successful in 2s
fix(content): correct drilling distance for Jevenstedt reference
2026-06-20 17:06:20 +02:00

18 lines
598 B
Plaintext

---
title: "110 kV Cable Route Jevenstedt OT Altenkattbek"
client: "wpd GmbH"
date: "2026-03-01"
dateString: "since 03/2026"
location: "24808 Jevenstedt"
featuredImage: "/assets/photos/DJI_0037.JPG"
---
- Excavation and backfilling of 500 m cable trench
- 4,500 m plowing of 3 x PE protective pipe d 160
- 12,000 m HDD directional drilling d 160
- 8,500 m laying of HV cable 1,000 mm² 64/110 kV
- 11 sets of connection joints 1,000 mm² 64/110 kV
- 2 sets of outdoor terminations 1,000 mm² 64/110 kV
- 8,500 m fiber optic cable blowing, 12 fibers
- High-voltage testing with PD measurement/OTDR