--- title: "New Cable Route, Forst" client: "Mitteldeutsche Netzgesellschaft Strom mbH" date: "2020-03-01" dateString: "03/2020 to 09/2020" location: "03149 Forst" featuredImage: "/assets/photos/DSC02156.jpg" --- - 2,984 m cable trench excavation and backfilling - 945 m horizontal directional drilling d 160 + d 50 - 3,929 m installation of MV cable 240 mm², 12/20 kV - 3,929 m installation of PE protection pipe 50 x 4.6 mm - 11 sets assembly of MV connection joint 240 mm², 12/20 kV - 1 set assembly of MV end termination 240 mm², 12/20 kV - 2,000 m dismantling of overhead line (incl. 16 poles)