--- title: "PV Plant Prötzel OT Sternebeck" client: "Trianel GmbH" date: "2025-08-01" dateString: "02/2025 to 08/2025" location: "15345 Prötzel" featuredImage: "/assets/photos/DJI_0243.JPG" --- - Excavation and backfilling of 2,600 m cable trench - 3,800 m HDD directional drilling d 225 / d 200 / d 160 - 7,500 m laying of MV cable 240 mm², 18/30 kV - 8,800 m laying of MV cable 800 mm², 18/30 kV - 15,800 m laying of PE protective pipe 50 x 4.6 mm - 15,800 m fiber optic cable blowing, 12 fibers - All medium voltage assembly works - VLF / Sheath testing / OTDR