--- title: "PV Plant Dettmannsdorf" client: "Energiekontor AG" date: "2026-06-01" dateString: "01/2025 to 06/2026" location: "18334 Dettmannsdorf" featuredImage: "/assets/photos/DJI_0301.JPG" --- - Excavation and backfilling of 12,300 m cable trench - 14,200 m HDD directional drilling d 225 / d 200 / d 180 - 26,500 m laying of MV cable 630 mm², 18/30 kV - 7,100 m laying of MV cable 1000 mm², 18/30 kV - 26,500 m laying of PE protective pipe 50 x 4.6 mm - 26,500 m fiber optic cable blowing, 12 fibers - All medium voltage assembly works - VLF / Sheath testing / OTDR