--- title: "Cable Connection U30 - T10, Eisenhüttenstadt" client: "ArcelorMittal Eisenhüttenstadt GmbH" date: "2019-07-01" dateString: "07/2019 to 12/2019" location: "15890 Eisenhüttenstadt" featuredImage: "/assets/photos/Etib_E-tib_Tiefbau_Guben_Netzanbindung_Energie_Vermessung_(24_von_99)_groß2.jpg" --- - 2,095 m cable trench excavation and backfilling - 180 m horizontal directional drilling d 160 + d 50 - 5,700 m delivery and installation of MV cable 240 mm², 18/30 kV - 3,000 m delivery and installation of PE protection pipe 50 x 4.6 mm - 3,000 m delivery and blowing in of FO cable, 12 fibers - 3,000 m delivery and installation of control cable, 0.6/1 kV - 16 sets delivery and assembly of MV connection joint 240 mm², 18/30 kV - 1 unit delivery and assembly of FO connection joint, 12 fibers - 4 sets delivery and assembly of MV T-connectors 240 mm², 18/30 kV - Main testing / sheath testing / OTDR measurement